The Planning Officer’s Report lends much weight to Bryn Bach Coal Ltd’s (BBCL) claim that most of the coal will be sent to non-burn end-use. BBCL has increased the proportion of coal it claims will go to non-burn end-use in successive versions of its application, without justification for these shifting proportions. The reality is that market conditions and the highest price would determine to which industry the coal would be sold. BBCL could at any time sell the mining rights to another company, as occurs at many coal mining sites, and that new company might choose to sell to other industries or export the coal as the Whitehaven proposal intends to. According to the BEIS Conversion Factors 2022, industrial application of the 94,900 tonnes of coal could total up to 229,000 tonnes of CO2.
Fugitive methane (a potent climate change accelerant) is released from directly from coal mines. Methane that escapes from coal mines globally must fall 11% each year until 2030 to meet IEA’s Net Zero 2030 Roadmap and avoid climate chaos. For each year of the proposed extension, researchers at Global Energy Monitor estimate 108 tonnes of methane will be released into the atmosphere at Glan Lash – totalling some 659 tonnes of methane. Increasing rather than decreasing this globally significant source of methane emissions breaches the IEA’s Net Zero 2030 Roadmap and does not conform to a globally responsible Wales.
The Planning Officer’s Report correctly identifies the shortcomings of the proposed replacement habitats, not least that new plantings are not commensurate with established habitats and the ecosystems they support, but the report stops short of pointing out that the habitats are unique and are not interchangeable and the criticisms of bio-diversity offsets. By way of crude analogy; someone who’s always lived in Carmarthen would not consider it the same if they had their house destroyed in Carmarthen but told they could move into another house in Merthyr Tydfil. We also highlight the Report’s reference to CCC’s independent ecologist’s point that equivalent biodiversity support from a newly planted woodland habitat (assuming it flourishes) will never catch up to that of the destroyed 2.48 Ha woodland habitat, had it not been destroyed – and that it would take 137 years to achieve what is currently supported. We question what the species of animals currently living in the existing habitat are to do for over a century in the intervening period. In a time of widespread habitat pressure, there isn’t clear evidence that animal life can be supported by neighbouring habitats to return later. Local populations, once wiped out, may never return. Growing climate change stresses on ecosystems necessitates established and robust habitats, existing biodiversity cannot wait 137 years for an established habitat. We do welcome the Planning Ecology Department’s determination that permitting this mine would be incompatible with both the Welsh Government and Carmarthenshire County Council declarations of a Climate and a Nature Emergency, as well as their respective responsibilities under the Well-being of Future Generations (Wales) Act 2015.
Over 600 letters from Carmarthenshire residents have been sent to the Council in opposition to the opencast coal mine application and a demonstration is planned outside the Council building on the day of the decision meeting to show local support for a greener, kinder future.
The Planning Officer’s Report refers to the company’s claim that the washery and coal mine would employ 11 staff (3 new jobs) for the duration of the proposed extraction and the restoration period following cessation. We want to emphasise that 8 of those jobs, as well as the indirect jobs, are not dependent on the proposed coal mine extension but rather on the washery which has been operating without Glan Lash coal for years. So just 3 new, time-limited, jobs in a declining industry are at stake, and these would be required to restore the site for a period anyway. Jobs planting trees over jobs ripping them up.
Published: 13/09/2023
As thousands of visitors travelled into Cumbria for the busy August bank holiday they were met with a powerful statement: 25 large banners opposing the proposed new coal mine near Whitehaven with the words ‘NO TIME for a COAL MINE’.
The banners, which targeted all the major roads leading into Cumbria on Friday 25th August were unfurled by new anti-coal action group ‘No Time for a Coal Mine’. Leaflets were handed out in in Kendal, Carlisle, Keswick, Kirkby Lonsdale and Penrith and fly posters also appeared.
It is the latest in a series of actions against the proposed 2.78 million tonne-a-year mine which has met with significant local, national and international opposition.
Continues...
Sarah McGowan who was born in Whitehaven and took part in the action says, "We can all see the impacts of climate change. In Cumbria the summer has been a washout since June, while on the Hawaiian island of Maui people escaped firestorms by jumping into the sea. Meanwhile the IPCC has said we simply cannot afford to permit any new coal mines, the UK government is flying in the face of reason. Our banners show the strength of feeling against the coal mine and our determination to keep the coal in the ground. The mine must be stopped.”
West Cumbria Mining Ltd is looking to extract a total of 67 million tonnes of coking coal from under the seabed off Whitehaven right up to 2049. The vast majority of this coal would be exported to foreign steelworks, as it is too high in sulphur to comply with UK and European air pollution regulations.[1]
Continues...
Of the two existing UK steelworks using coal, Tata Steel alone could tolerate small amounts of coal from Whitehaven. Tata Steel is currently negotiating with government for subsidies to decarbonise, ending coal use, or it has threatened closure. If the project goes ahead, the Cumbrian coal would emit more than 200 million tonnes of CO₂, primarily from its use in blast furnaces. Its extraction would result in the release of around 334,000 tonnes of methane even if mine methane capture equipment is used (901,000 tonnes without capture).
So far, 2023 has seen the hottest global temperatures for June and July in recorded history. Hundreds of millions of people across the USA, Europe and Asia have been hit by extreme heat while deadly wildfires have raged through southern Europe, Canada, Russia, Hawaii and beyond.
Continues...
The government’s approval of this proposed mine faces two legal challenges, that was due to be heard in the High Court in October 2023. This has recently been delayed pending the outcome of a recent Supreme Court case relating to the oil wells at Horse Hill, Surrey (Finch v Surrey County Council). Both cases relate to consideration of end-use emissions in the Environmental Impact Assessment. If the Supreme Court decides that end-use emissions should be considered, this would greatly increase the chance of the government’s decision on the proposed mine being revoked.
Increasing global temperatures threaten food and water security for many millions of people, endanger lives and will
increase mass migration as areas around the world become uninhabitable. Globally, it is those who have done the least to cause the climate crisis who are already suffering the most.
The banners show the strength of public feeling against the government’s coal proposal, and highlights that there are many people prepared to take action to ensure that the coal remains underground at Whitehaven.
Reference
[1] Cumbria County Council Executive Director - Economy and Infrastructure, Development Control and Regulation Committee Application Reference No:4/17/90077.17
FIRST... Coal mining ban proposed by House of Lords
With a margin of 3 votes (197 for vs 194 against) in the House of Lords on 17th April 2023, Lord Teverson amended the Energy Bill to include a new clause on the 'prohibition of new coal mines' (a ban on the Coal Authority licencing any new coal mining in the UK). This wouldn't stop any coal mines already licenced, and would only apply 6 months after the bill had been passed - but it would cut off the pipeline of new coal mine applications. Just one Conservative Lord voted for this amendment - Lord Deben, Chairman of the UK's independent Committee on Climate Change.
Lord Teverson referred to the Whitehaven coal mine, approved in December 2022, when proposing the amendment, saying "If that happens once, it can happen again - that is why this amendment is so important," he said. He had previously believed a ban was not necessary because it was "totally and absolutely obvious" that building a new coal mine "would be a really stupid thing for a country to do".
THEN... Coal mining ban stripped out by UK Government
Back in the House of Commons, the UK Government Ministers stripped out the amendment banning new coal mines at the Committee-stage, before the revised Energy Bill could be debated and voted on in the House of Commons. MP Caroline Lucas said the Government's approach was "well and truly stuck in the last century...after endlessly repeating the importance of no new coal at COP26, its words have proved to be meaningless". Shadow energy secretary Ed Miliband had said Labour would back the ban.
Opposing the amendment, minister Lord Callanan said the government was committed to phasing out coal but argued that an outright ban could cause a "severe weakening of our security of supply".
NOW... Coal mining ban re-proposed by MPs Chris Skidmore & Wera Hobhouse
In the report stage, Conservative MP Chris Skidmore and Libdem MP Wera Hobhouse have attempted to re-introduce the coal mine ban by tabling similar wording as Lord Teverson's amendment to be put back into the Energy Bill (clause N2). MP Chris Skidmore also seeks to strengthen the UK Government's earler commitment to phase out coal being used to generate energy by tabling another clause (N3) - a prohibition of energy production from coal by 1 January 2025. This would change put the UK Government's policy commitment into legally-binding legislation, making it much harder for this or successive Governments to back-track on that commitment.
Amongst other important ammendments, the wording of the two amendments your MP needs to support are:
NC2 Tabled by: Chris Skidmore & Wera Hobhouse
To move the following Clause—“Prohibition of new coal mines
(1) Within six months of the day on which this Act is passed, the Secretary of State must by regulations prohibit the opening of new coal mines and the licensing of new coal mines by the Coal Authority or its successors.
(2) Regulations under this section are subject to the affirmative procedure.”
NC3 Tabled by: Chris Skidmore
To move the following Clause—“Prohibition of energy production from coal
(1) The Secretary of State must by regulations provide for the UK to cease energy production from coal from 1 January 2025.
(2) Regulations under this section may amend primary legislation (including this Act).”
The report stage for the Energy Bill is currently scheduled for Tue 5th September 2023, the day after the House of Commons returns from summer recess, at which point MPs will debate the various amendments tabled to the Energy Bill. The amendment will almost certainly be debated, however there’s no guarantee that it will be pushed to a vote – this depends on a range of different factors, including MPs’ priorities and whether the amendment is selected by the Speaker for a vote.
THE ASK: write to your MP, asking them to speak in favour of amendment NC2 and NC3 during the debate, and to vote for it, if it is "pushed to a division".
We are now able to reveal correspondence between Welsh Minister for Climate Change, MS Julie James, and then UK Government Minister Minister of State for Energy, Clean Growth
and Climate Change, MP Greg Hands. In a letter dated 07 January 2022, Minister Greg Hands states:
"I do agree that the Coal Authority’s statutory duty to promote an economically viable coal industry, as set out in the Coal Industry Act 1994, is at odds with our climate leadership ambitions and policies on coal so we are looking at measures to review that duty. I understand our officials have agreed to meet to share our thinking on a future licencing regime that reflects our different administrations net zero and climate change goals."
The amendment(s) proposed by MP Chris Skidmore (and Wera Hobhouse) would achieve what Greg Hands admits is necessary to meet the Government's climate commitments. So why did the UK Government remove Lord Teverson's amendment to achieve the same? What has the UK Goverment done to change the "future licencing regime"?
Welsh Labour Minister for Climate Change in the Welsh Government Julie James wrote to then Secretary of State Department of Business, Energy & industrial Strategy Kwasi Kwarteng in the UK Government on 26 October 2021, stating:
"...we consider the statutory duty of the Coal Authority to develop and maintain a viable coal extraction industry must be removed if we are to achieve our policy ambitions." adding "I seek to understand how the [Coal Industry] Act will be amended to reflect the need for the Coal Authority to consider climate policy in its decisions". Julie James is looking for reform rather than dissolving the Coal Authority, saying "....the Coal Authority has an important role to play in rapidly winding down remaining mining operations and delivering long-term environmental protection. In doing so, the Coal Authority has an important role in ensuring those communities affected by the legacy of coal mining receive a just transition."
Welsh Labour clearly indicate the need to reform the Coal Authority in a way that would stop new coal mine applications being licenced and support existing operations winding down, with a just transition for workers involved.
The need for law change: This year, Coal Action Network took the Coal Authority to the Cardiff Courts in a judicial review challenging the Coal Authority's insistence that it cannot consider matters such as climate change in determining whether to award a coal mining licence. The judge agreed with the Coal Authority, which confirms that legislative reform of the Coal Authority is needed to bring its licencing function in line with climate commitments - such as that proposed in amendment NC2 to the Energy Bill.
Time's running out: Since senior UK and Welsh Government Ministers admitted the need to cut off the pipeline of new coal mining applications, both the UK and the planet experienced its hottest ever days (2022 & 2023), June 2023 was the UK's hottest ever, and July 2023 was confirmed the hottest month worldwide since records began, and this year the world has been rocked by wild-fires, flooding, and storms. So the sense of urgency to ban coal mining and use has become even stronger.
Security of supply concerns: Alongside increasing this escalating urgency, TATA Port Talbot steelworks announcing it will imminently transition to recycling steel or else face closure, and British Steel reporting it will close its coke ovens. A credible home insulation plan would remove any energy security issues for keeping warm this - and future - winters, rather than spending more of my tax money propping up dirty coal power stations again. These are the only significant consumers of coal remaining in the UK so there is no energy security case to be made for continuing to mine coal in the UK.
On 15th and 16th March, Coal Action Network took the Welsh Government and Coal Authority (UK regulator of coal mining) to the Cardiff Court in a judicial review over their respective handling of the Aberpergwm application to extend workings by up to 42 million tonnes of coal and until 2039.
On the 19th of May, The Hon. Mrs Justice Steyn DBE decided in favour of the Welsh Government and Coal Authority, but granted us permission to appeal the decision about the Welsh Government less than 2 weeks later, on 31st May. Our court hearing for the appeal will be 06th February at the Cardiff Court!
The grounds for this appeal are:
This drone footage shot on 06 April 2023 shows plainly the local environmental impact of the Glan Lash opencast coal mine, and sends a powerful message to Carmarthenshire's Councillors, expected to make a decision in the coming months on whether to allow this local environmental travesty to expand in size and continue for longer. See our quick read on the application. Want to go on a deep dive on the Glan Lash coal mine? Read our report.
The Glan Lash opencast coal mine has been dormant since 2019. Restoring the site will provide employment and environmental benefits. From Carmarthenshire? Email your Planning Councillors through our form below, urging them to make the right decision.
You did it! Permission was refused on 14/09/23 by unanimous vote, after 826 residents objected!
Completing our contact form sends your message to all 20 Councillors on the Carmarthenshire Planning Committee, Council, and us.
Will Councillors reject the application to expand and extend the Glan Lash opencast coal mine, learning from the huge challenges that Merthyr Tydfil County Borough Council is having with the illegal Ffos-y-fran opencast coal mine?
Put into your own words why you want Carmarthenshire Planning Committee to reject the application - here's some points you might choose to include:
Wrth gwbhau ein ffurflen cyswllt mae eich neges yn cael ei anfon i bob un o’r 20 Cynghorydd ar y Pwyllgor Cynllunio Sir Gâr, Cyngor, a ni.
Bydd y Cynghoryddion yn gwrthod y gais i ddatblygu ac ymestyn y pwll glo cast agored Glan Lash, dysgu o’r sialensau anferth mae Cyngor Bro Sir Merthyr Tydfil yn cael gyda’r pwll glo cast agored anghyfreithlon Ffos-y-Fran?
Rhowch yng ngheiriau eich hyn pam yr ydych chi eisiau i Pwyllgor Cynllunio Sir Gâr i wrthod y gais - dyma rhai pwyntiau gallwch ddewis i gynnwys:
The hearing of two legal challenges against the government's approval of a 2.78 million tonne a year coking coal mine has been delayed from October, likely into the new year.
Part of both challenges rely on the outcome of a separate judgement from the Supreme Court. A judgment is due on that landmark case, over the decision to allow oil drilling at Horse Hill in Surrey, brought by campaigner Sarah Finch on behalf of the Weald Action Group. The Horse Hill challenge was heard by the Supreme Court in June and the court has not yet given judgment.
According to Friends of the Earth "lawyers for Ms Finch argued that the environmental impact assessment (EIA) carried out by developers before planning permission was granted should have accounted for the climate impacts from burning the oil extracted at Horse Hill. These are known as ‘downstream’ or ‘Scope 3’ emissions and were not accounted for during the planning process."
"Downstream emissions are increasingly being left out of environmental impact assessments when planning applications are made for fossil fuel projects, despite the huge climate impacts these projects will inevitably create, the mounting climate crisis and the UK government’s stated commitment to net zero."
"If Ms Finch’s challenge is successful, with the court potentially ruling that decision makers need to take into consideration downstream emissions before approving planning applications, the outcome of the Horse Hill case could have major implications for the future of the Whitehaven coal mine. It could open up new grounds for lawyers to argue against the mine’s approval on the basis that downstream emissions were not considered."
"The Supreme Court is not expected to give its judgment until autumn 2023 at the earliest. When that does eventually happen, the High Court will then set a date for the Whitehaven hearing, but there is likely to be a gap of at least ten weeks between judgment and hearing. Lawyers for Friends of the Earth and SLACC therefore believe a 2024 Whitehaven hearing is increasingly likely." Further details from Friends of the Earth can be read here.
Originally the two legal challenges by South Lakes Action on Climate Change (SLACC) and Friends of the Earth were rejected. Then it was decided that the cases will be heard at what’s known as a ‘rolled up’ hearing which in practice this is the same as a trial. As long as permission is given in day one, the trial will last for three days. This was planned to take place 24th to 26th October 2023. This will now not be heard until a later date.
Friends of the Earth and SLACC launched their legal challenges in January 2023 after Michael Gove, Secretary of State for Levelling Up, Housing and Communities, gave planning permission to the new coking mine in December 2022. The organisations were the 2 main parties opposing the coal mine at the planning inquiry which took place in September 2021.
SLACC and Friends of the Earth contend that Mr Gove failed to account for the significant climate impacts of the mine, including the acceptability of carbon credits to offset the mine’s emissions, the international precedent that opening a new mine would set and the impact of opening the mine on the global coal market. For further details of the challenges see https://www.coalaction.org.uk/2023/01/27/legal-challenges-whitehaven/
With support from the Good Law Project, we have filed for a Judicial Review against both the Local Council and Welsh Government’s continuing failure to stop Ffos-y-fran, the UK’s biggest opencast coal mine, selling off over 1,000 tonnes of illegal coal each day right under their noses and to the harm of local residents, the surrounding environment, and our climate.
Even more scandalously, the Welsh Government has been profiteering by transporting this illegal coal along its railways over the past 11 months, to be burned by various customers in direct breach of its own climate commitments and policies against coal extraction.
Good Law Project has joined the fray, and are supporting us to finally stop the environmental onslaught of Ffos-y-fran with a judicial review. This has allowed us to assemble a crack legal team from Richard Buxton Solicitors, and Barristers’ Toby Fisher and James Maurici KC. Please share and donate to Good Law Project’s Crowdfunder (and check out their website, we could gush over all their work).
We are optimistic the legal pressure we’ve just heaped on will finally put a long-overdue end to what should never have happened in the first place. As with our judicial review (and now appeal!) of Aberpergwm deep coal mine, we shouldn’t have to undertake costly legal action to force the Welsh Government to fulfil its obligations to the current and future generations, in Wales and across the world.
See our Statement of Facts and Grounds (PDF) summarised below -
Coal Action Network is seeking to have judicially reviewed:
The grounds of claim are:
Coal Action Network is seeking a hearing on the first available date after 20 August 2023 to determine the following remedies:
After that, we’ll be campaigning for:
But what we must do now is to stop the daily environmental onslaught of the coal mine, producing equivalent to c4,000 tonnes of CO2 every day – or the average daily emissions of 175,000 people living in Wales, which is around 3x the population of Merthyr Tydfil itself! Imagine burning 1.75 MILLION litres of petrol every single morning – that’s the amount of CO2e this coal mine has been allowed to add to our atmosphere every day so far, illegally and without consequence.
Together, you, us, local residents, Good Law Project, and a network of Welsh groups like FOE Cymru, Climate Cymru, and XR Wales will prevail and put an end to this climate calamity any way we can. Let’s show the Council and Welsh Government how it’s done – time to roll up our sleeves and shut this mine down.
Let’s get it done
This week, facing mounting pressure from campaigners, Lloyd’s of London syndicate, Probitas1492, ruled out providing insurance for Adani’s Carmichael coal mine and its related infrastructure. Probitas was known to insure the mine’s transport system, but also admitted that the mine itself had been insured through the Lloyd’s of London marketplace.
Ash Bathia, Chief Executive Officer of Probitas Managing Agency wrote to Money Rebellion, stating: “I can confirm that Probitas1492 ceased to provide insurance for the Adani Coal Mine at the end of last year, and will also not provide any insurance support in the future for any ancillary or associated activities, including the trainline, once the existing policies expire in the next quarter.”
Various environmental groups have targeted Probitas since February, when an industry tip-off revealed that they were underwriting Adani’s train line and haulage operation. Last week, Money Rebellion activists staged a ‘die-in’ protest at Probitas’s London office. This followed disruption to Lloyd’s AGM in May, and a delivery of giant Valentine’s Day cards asking Probitas to exit the mine, including from the head man of Waddananggu tribe.
Claude Fourcory, Money Rebellion, said: “This is a massive win for the movement. Deadly fossil fuel projects like Adani’s Carmichael mine can’t be allowed to continue. Insurers at Lloyd’s of London are only going to see bigger and bigger protests, as more people understand their involvement in enabling climate breakdown.”
Gurridyula Gaba Wunggu, Wangan and Jagalingou Cultural Custodian, said: “Probitas1492 has made the right decision – this shows the strength and determination of everyone who played their part in forcing their hand. This is also a message to all other Adani financiers and insurers – we are coming for you too and we will not stop until you pull out from Adani. This has been the homeland of our people for millennia. Any insurer or financier still backing Adani is complicit in the destruction of Wangan and Jagalingou homelands and the ethnic cleansing of our culture and people. Don’t underestimate our determination. We plan to be here until Adani is forced to abandon this project, so we can watch them pack up and leave our homelands for good.”
Set to be the largest coal mine in Australia, Carmichael has been called a ‘carbon bomb.’ [1] The Queensland project would produce enough coal over its lifetime to emit 4.6 billion tonnes of CO2, equivalent to over ten years of the UK’s annual emissions. The Australian coal is burned in Adani’s Godda power station in Jharkhand, India, which is already mired in human rights abuses including forced displacement, and two workers have been killed on site.
Probitas1492 now joins 45 of the world’s biggest insurers who have distanced themselves from the mine, including five that had previously provided Adani with coverage: Brit, Apollo, Ascot, Aspen, Tokio Marine and Kiln. 28 of these insurers manage syndicates at the Lloyd’s marketplace.
Marsh McLennan, the world’s largest broker, stopped arranging insurance for Adani last year due to pressure over the project’s environmental abuses.
The Adani Carmichael mine has received widespread condemnation from climate scientists and activists, both locally and internationally, for its impact on water usage and carbon emissions. The mine’s Abbot Point coal port is located in the Great Barrier Reef World Heritage Area, and campaigners estimate the mine would bring 500 coal ships through it every year.
Meanwhile, experts fear that Adani’s vast drainage of nearby groundwater may have already “locked in” irreversible damage to local, ancient wetlands known as the Doongmabulla Springs.
The springs are sacred to the land’s traditional owners, the Wangan and Jagalingou people, who have never given their free, prior and informed consent to the mine. Indigenous leaders have resisted the project since its inception.
Pablo Brait, Campaigner at Market Forces in Australia said: “The Carmichael coal mine is one of the most controversial projects in Australia’s history. It will drain the region of billions of liters of water per year, putting agriculture at risk. It is increasing industrialisation in the already distressed Great Barrier Reef, and it will fuel worsening floods, heatwaves and bushfires. The Carmichael operations are paving the way for more climate-wrecking coal mines in the region, and its dirty coal is being used by Adani to expand its fossil fuel burning activities in India.”
More trouble for Adani
Adani began exporting small amounts of coal from Carmichael in 2022 – 8 years behind schedule – and has been rocked by difficulties throughout.
Earlier this year, Lockton, another top-10 global broker, entered talks with Adani, before deciding in July not to proceed after pressure from campaign groups and staff.
In total, 113 major companies in the banking, insurance, rail freight and engineering sectors have now ruled out support for Adani Carmichael, or the Adani Group entirely. This includes banking giants BNY Mellon and China’s ICBC.
Controversy for Lloyd’s
Probitas1492’s involvement with Adani is understood by campaigners to have caused controversy within the Lloyd’s of London marketplace. Lloyd’s policy, as of 1 January 2022, asks syndicates not to take on new thermal coal risks. Lloyd’s has been criticised, however, for failing to implement this.
Andrew Taylor, Coal Action Network said: “The fact that the Adani coal mine infrastructure was still being insured through Lloyd’s points to an abject failure of its ESG policy. It shouldn’t take thousands of people from across the world to pressure Lloyd’s managing agents to cut ties with new fossil fuel projects. These companies need to act themselves and adopt policies and behaviour that reflect the existential threat climate change poses.”
Due to the pooled nature of coverage written at Lloyd’s, other syndicates may still be involved in Adani Carmichael. Lloyd’s managing agents yet to comment publicly on their involvement include: Barbican, Hamilton, Markel, Renaissance Re, SA Meacock and Starr.
Probitas1492’s withdrawal follows comments from Dominic Hoare, Chief Underwriting Officer at Lloyd’s Munich Re Syndicate and a senior industry figure, on the reputational risk of insuring fossil fuels: “Reputation is now key and reputation affects your share price…From our point of view, pressure to cease underwriting is very effective. Insurance is an incredible tool for enacting change.”
Lloyd’s of London is the world’s oldest and largest global insurance market. Developed in the 1600s, it drew its initial wealth from insuring the slave trade. It remains the world’s largest insurer of fossil fuels.
1) Friends of the Earth demonstration on the first day of the legal challenge against planning permission for the mine (by Friends of the Earth and South Lakes Action on Climate Change).
🗓 Tuesday 16th July
⏰️ 9 - 9.45am
📍 Royal Courts of Justice, Strand, London WC2A 2LL
More details see here.
2) No to West Cumbria Coal Mine demonstrations
Theme: Coal is our heritage, Green Jobs our Future
Leafleting & speakers
🗓 Monday 15th July
⏰️ 5.30pm to 7.30pm (speakers at 6.30pm)
📍 Whitehaven Market Place
3) Photo opp illustrating Green Jobs
🗓 Tuesday 16th July
⏰️ 9am to 10am
📍West Cumbria Mining office, Solway Rd, Kells, Whitehaven CA28 9BG
Note: this location is NOT the mining site but the former Mining museum closer to town
Check out previous events here. Come to the next one and show your support for leaving the coal in the ground at this site and all other coal seams.
Please note the events are not organised by Coal Action Network, but a coalition of groups and Cumbria residents. More details will be added when they are available.
Respected senior Barristers, James Maurici KC, and Barrister Toby Fisher have today released a blistering open letter of legal advice that reveals for the first time that the company operating the UK’s largest opencast coal mine, Ffos-y-fran, in South Wales is doing so “unilaterally and unlawfully” without the approval of “any democratically elected bodies or persons”, yet the approach of political representatives in Wales so far means “there will be no consequence for that unauthorised and unconstrained activity”. This approach, the Barristers argue, may even be unlawful. The letter further warns this may fail to prevent “future operators from acting in the same way”.
View in original PDF or read below.
IN THE MATTER OF FFOS-Y-FRAN COAL MINE
AND IN THE MATTER OF THE TOWN AND COUNTRY PLANNING ACT 1990
OPINION
For correct paragraph numbering, please refer to the PDF.
INTRODUCTION AND SUMMARY
We are asked by Coal Action Network for our opinion on the ongoing situation at Ffos-y-Fran coal mine, Merthyr Tydfil (‘the Site’). In particular, we are asked for our opinion on the past and future exercise of statutory enforcement powers by Merthyr Tydfil County Borough Council (‘the Council’) and the Welsh Ministers.
THE FACTS
“If coal mining operations continue on site, this would result in a breach of the planning conditions and may be subject to enforcement action. At this stage because a planning application has been submitted, which seeks to amend to the current permission and enable operations to continue on site, it would not normally be expedient to take enforcement action until that application has been determined…”
In conclusion, the Authority is of the opinion that the proposed development, either alone or in combination, is unlikely to have a significant adverse effect on the environment. The extension of 9 months to complete the development previously approved will extend the impacts of the development. However, these impacts have previously been assessed as being at an acceptable level subject to mitigation and limitations provided by planning conditions. There is no proposed change to the method of working and therefore no environmental impacts are envisaged over and above those experienced as part of the 2005 planning permission. As such, the likely effect of the development is unlikely to be significant enough to warrant an EIA.
The First Screening Opinion did not address the climate change impacts of, or greenhouse gas emissions attributable to, the proposed extended life of the development.
“The extension of extraction operations until 31 March 2024 and a delay in the completion of final restoration until 30 June 2026 in order to complete the development previously approved will extend the impacts of the development. However, these impacts have previously been assessed as being at an acceptable level subject to mitigation and limitations provided by planning conditions. There is no proposed change to the method of working and therefore no environmental impacts are envisaged over and above those experienced as part of the 2005 planning permission. As such, the likely effect of the development is unlikely to be significant enough to warrant an EIA.”
The Second Screening Opinion did not address the climate change impacts of the proposed extended life of the development.
THE LEGAL CONTEXT
Wellbeing of Future Generations
Planning permission and EIA
Enforcement powers
“(a) carrying out development without the required planning permission; or
(b) failing to comply with any condition or limitation subject to which planning permission has been granted…”.
“(1) The local planning authority may issue a notice (in this Act referred to as an “enforcement notice”) where it appears to them
(a) that there has been a breach of planning control; and
(b) that it is expedient to issue the notice, having regard to the provisions of the development plan and any other material considerations.”
“(1) If it appears to the Secretary of State to be expedient that an enforcement notice should be issued in respect of any land, he may issue such a notice.
(2)The Secretary of State shall not issue such a notice without consulting the local planning authority.
(3)An enforcement notice issued by the Secretary of State shall have the same effect as a notice issued by the local planning authority.”
“[s]trictly, and in contrast to s.172, there are no express tests of it having to appear to the Secretary of State that there has been a breach of planning control and having to have regard to the provisions of the development plan and to any other material considerations. However, there is no good reason to infer that the Secretary of State could lawfully issue an enforcement notice without first applying these tests. They are of course very likely to arise in consultation with the local planning authority in any event.”
“if the Act made clear that compensation will not in any circumstances be payable for a use or operation which is in breach of planning control, there would be less concern at the risks of a notice failing on a technicality, and the use of stop notices in appropriate cases would be encouraged”: para 9.5.”
Relevant case law
Discretion over enforcement
“25. Where a developer is acting in breach of planning control, the statutory scheme assigns the primary responsibility for deciding whether to take enforcement steps – and, if so, what steps should be taken and when – to the relevant local authority. The statutory language used makes it clear that the authority’s discretion in relation to matters of enforcement – if, what and when – is wide. That is particularly the case in respect of enforcement notices, the power to issue a notice arising only “where it appears to them… that it is expedient to issue the notice”. That is language denoting an especially wide margin of discretion. Any enforcement decision is only challengeable on public law grounds. Because of the wide margin of discretion afforded to authorities, where the assertion is that the decision made is unreasonable or disproportionate, the court will be particularly cautious about intervening. Intervention is likely to be rare. However, circumstances may make it appropriate. In Ardagh Glass, because the four-year period for enforcement was imminently to expire, a failure on the part of the planning authority to take prompt enforcement steps would have meant that the development would achieve immunity. In that case, the court ordered immediate enforcement action to be taken.”
“So, even though the authority may be satisfied that a breach of planning control has occurred, they may consider it not expedient to issue an enforcement notice because on balance the use causes no planning harm at all, or is beneficial, or may cause insufficient harm to justify the taking of any enforcement action. Alternatively, the authority's conclusions on expediency may determine the nature and extent of any enforcement action they decide to take.”
“[30] Maguire J referred to paragraph [22] of Ardagh Glass Ltd as being in point in the present cases. There was an Enforcement Notice already in existence, the issue was whether a Stop Notice had to be served and there was also an appeal against the Enforcement Notice. It was stated that Sullivan LJ plainly viewed his conclusion on the point as not inconsistent with EU law and Maguire J stated that he was inclined to follow that view.
[31] Maguire J rejected the proposed distinction of the decision in Ardagh Glass Ltd based on the possibility of rectifying the damage in Ardagh by requiring the building to be removed if planning permission was not granted, whereas in the present case it was not possible to return extracted sand.
[32] This Court is of the opinion that there is a distinction to be made between Ardagh Glass Ltd and the present case and that it bears on the application of the principles to be applied. In Ardagh Glass Ltd it was found that the issue of an Enforcement Notice was sufficient to ensure the removal of the unauthorised development if retrospective planning permission was not granted. While the workings might continue in the meantime, it was recognised that ultimately, if necessary, the unauthorised development, in the form of the factory structure, could be removed. However the present case is different in character. There is no such structure to be removed in the event that planning permission is ultimately refused. The unauthorised development is the excavation which cannot be reinstated. Of course, as in Ardagh Glass Ltd, there will also be the ongoing operations at the site but the focus is on the structure rather than the workings. In the present case the issue of the Enforcement Notice will not be sufficient to ensure the removal of the unauthorised development in the form of the excavation between now and the refusal of planning permission. The material extracted is irreplaceable. Therefore the basis on which no Stop Notice was issued in Ardagh Glass Ltd does not apply in the present case.”
THE POLICY CONTEXT
Development Management Policy
“Where an LPA considers that an unauthorised development is causing unacceptable harm to public amenity, and there is little likelihood of the matter being resolved through negotiations or voluntarily, they should take vigorous enforcement action to remedy the breach urgently, or prevent further serious harm to public amenity.”
“An effective development management system requires proportionate and timely enforcement action to maintain public confidence in the planning system but also to prevent development that would undermine the delivery of development plan objectives.
The Welsh Government enforcement review concluded, whilst the system is fundamentally sound, it can struggle to secure prompt, meaningful action against breaches of planning control. The system can also be confusing and frustrating for complainants, particularly as informed offenders can intentionally delay enforcement action by exploiting loopholes in the existing process…
Section 3.6 of Planning Policy Wales is clear; enforcement action needs to be effective and timely. This means that Local Planning Authorities should look at all means available to them to achieve the desired result. In all cases there should be dialogue with the owner or occupier of land, which could result in an accommodation which means enforcement action is unnecessary.
…Section 14.2 of the Development Management Manual… deals with how this policy should be implemented. Paragraph 14.2.5 is particularly useful in that it explains how the dialogue with the owner or occupier is one aspect of dealing with an enforcement case but it should not be a source of delay or indecision.”
Coal policy in Wales
“The opening of new coal mines or the extension of existing coaling operations in Wales would add to the global supply of coal having a significant effect on Wales’ and the UK’s legally binding carbon budgets as well as international efforts to limit the impact of climate change. Therefore, Welsh Ministers do not intend to authorise new Coal Authority mining operation licences or variations to existing licences. Coal licences may be needed in wholly exceptional circumstances and each application will be decided on its own merits, but the presumption will always be against coal extraction.
Whilst coal will continue to be used in some industrial processes and non-energy uses in the short to medium term, adding to the global supply of coal will prolong our dependency on coal and make achieving our decarbonisation targets increasingly difficult. For this reason, there is no clear case for expanding the supply of coal from within the UK. In the context of the climate emergency, and in accordance with our Low Carbon Delivery Plan, our challenge to the industries reliant on coal is to work with the Welsh Government to reduce their reliance on fossil fuels and make a positive contribution to decarbonisation.
Planning Policy Wales (PPW 11) already provides a strong presumption against coaling, with the exception of wholly exceptional circumstances, and Local Planning Authorities are required to consider this policy in the decisions they make.”
“5.10.14 Proposals for opencast, deep-mine development or colliery spoil disposal should not be permitted. Should, in wholly exceptional circumstances, proposals be put forward they would clearly need to demonstrate why they are needed in the context of climate change emissions reductions targets and for reasons of national energy security.”
ANALYSIS
The unauthorised development is likely to be EIA development
The Council’s failure to consider enforcement action prior to its decision on planning permission was arguably unlawful
Notwithstanding this knowledge, the Council adopted the inflexible position that – because a planning application was pending for the activity – it would first consider whether it would grant planning permission before considering enforcement. It identified 26 April 2023 as the date on which the Planning Application would be considered and determined that enforcement action would only be considered after that date. We consider that approach was arguably unlawful because it amounted to the fettering of a statutory discretion and/or because it was irrational in the circumstances.
The Council’s failure to serve a stop notice is arguably unlawful
“the unauthorised development is the excavation which cannot be reinstated… the issue of the Enforcement Notice will not be sufficient to ensure the removal of the unauthorised development in the form of the excavation between now and the refusal of planning permission. The material extracted is irreplaceable.”
The Welsh Ministers failure to consider issuing an enforcement notice before the Council took its own decision was arguably unlawful
“[a] lawful positive decision to the effect that it would not be expedient for the purposes of section 172 to issue an enforcement notice would eventually lead to the development in breach becoming lawful with the passage of time but of itself would not stop the permission lapsing. A lawful positive decision by a local authority cannot without more preclude the exercise by the Secretary of State of his default powers under section 182”.
The Welsh Ministers must urgently consult with the Council and consider, independently, whether to serve a stop notice.
NEXT STEPS
21 June 2023
JAMES MAURICI KC
Landmark Chambers
TOBY FISHER
Matrix Chambers
[1] For the references and calculations behind these figures, see fns 7 – 11 below.
[2] See R. (Holding & Barnes Plc) v Secretary of State for the Environment, Transport and the Regions [2003] 2 A.C. 29569 per Lord Hoffmann at [69] “[i]n a democratic country, decisions as to what the general interest requires are made by democratically elected bodies or persons accountable to them … sometimes one cannot formulate general rules and the question of what the general interest requires has to be determined on a case by case basis. Town and country planning or road construction, in which every decision is in some respects different, are archetypal examples. In such cases Parliament may delegate the decision-making power to local democratically elected bodies or to ministers of the Crown responsible to Parliament. In that way the democratic principle is preserved.”
[3] Application P/22/0237
[4] See https://shorturl.at/pAN19.
[5] If the Council had concluded that “wholly exceptional circumstances” had been made out, it might reasonably have been expected to require the mitigation of the climate change effects of the extension by, for example, requiring the developer to offset its emissions.
[6] Robert Carnwath QC, Enforcing Planning Control, HMSO February 1989.
[7] MSWL reported its 2021 emissions as 930,533 tonnes CO2e, excluding methane emissions. (2021 Annual Accounts p 4, Companies House) Coal Authority quarterly reports indicate that total production in 2021 was 602,128; operational (non-methane) emissions were thus reported to be 1.55 tonnes CO2e per tonne of coal mined. Assuming a rate of 1.5 tonnes CO2e per tonne of coal for the 500,000 tonnes coal estimated to be mined during an 18-month period leads to an estimate of approximately 750,000 tonnes CO2e. Methane emissions from the Ffos-y-fran mine has been estimated to be 2,077 tonnes over a 9-month extension by Global Energy Monitor using methodology from Kholod et al, 256 Journal of Cleaner Production (2020), https://doi.org/10.1016/j.jclepro.2020.120489. This equates to 4,154 tonnes over 18 months. Using a conservative estimate of 30 for the global warming potential of methane to convert to carbon dioxide equivalent (see https://www.iea.org/reports/methane-tracker-2021/methane-and-climate-change) this equates to a further 124,620 tonnes CO2e. Or, in all, roughly 870,000 tonnes CO2e.
[8] The 2023 BEIS conversion factor for industrial coal is used (this being a conservative assumption, as the domestic coal conversion factor would produce a higher figure). 500,000 tonnes of coal x 2.39648 BEIS figure for tonnes of CO2e = 1.198 million tonnes CO2 equivalent.
[9] 2023 BEIS conversion factor for Petrol is 2.35 Kg CO2e per Litre. 851M Litres x 2.35 = 2 billion Kg or 2 Million tonnes.
[10] Per capita annual GHG emissions in Wales are 8.6 tonnes CO2e per person. See https://www.gov.uk/government/statistics/uk-local-authority-and-regional-greenhouse-gas-emissions-national-statistics-2005-to-2020, statistical summary (30 June 2022). Over an 18-month period this equates to 12.9 tonnes CO2e per person in Wales (8.6x1.5). 2 million/12.9 = 155,000.
[11] See the Institute of Environmental Management & Assessment (IEMA) Guide: Assessing Greenhouse Gas Emissions and Evaluating their Significance, Second Edition, February 2022.
[12] Section 183(3) of the 1990 Act provides that a stop notice may not be served where the related enforcement notice has taken effect. However, where an appeal against the enforcement notice is made (which must be done before the enforcement notice takes effect), section 175(4) suspends the effect of the enforcement notice until the appeal is finally determined or withdrawn. Accordingly, if there is an appeal against the EN, the Council may serve a stop notice at any time during the currency of the enforcement appeal. For reasons we have explained, however, we consider that a stop notice should be served urgently without waiting for an appeal to be made.
[13] We have considered whether the Council might judge that permitting the continued operation in breach of planning control might be desirable to enable the operator to make profits to plug a shortfall in its available capital for site restoration. We consider this would be an irrelevant consideration in the context of a decision on expediency.