BACK TO TOP

Key facts: Whitehaven coal mine

West Cumbria Mining Ltd want to extract 2.78 million tonnes of coking coal annually, in what would be the UK's first new underground coal mine in 30 years. Cumbria County Council approved the application, but in March 2021, the Government decided it will make the final decision as a result of demands from many people and Offices, including over 113,999 people supporting Coal Action Network's demand the government call in the decision.

Key facts & figures

Coal & refuse to be excavated: 67 million tonnes in total - almost 3 million tonnes per annum (at full production) - WCM Planning Statement, Sep 2021

Coal to be sold: 64 million tonnes of coal in total - 2.78 million tonnes of coal per annum (at full production) - WCM Planning Statement, Sep 2021

CO2: Approximately 200 million tonnes of CO2 in total - 8,800 million tonnes of CO2 per annum at full production (2022 BEIS Conversion Factors)

Methane: 340,000 tonnes of methane which is 34 million tonnes CO2 equivalent (not included in the figures above) - 15,000 tonnes of methane per annum at full production (mid-range estimate, measured over 20 years, Global Energy Monitor's Global Coal Mine Tracker)

Coal operator: West Cumbria Mining (Holdings) Limited, which is 82% owned by EMR Capital Investment Limited (No. 3B PTE Ltd) registered in Singapore.

Type: Coking (metallurgical) coal

Claimed destination: primarily burned in steelworks in the UK and Europe

Local Planning Authority: Cumbria County Council

Address: from the former Marchon site, Pow Beck Valley, to St. Bees Coast, Whitehaven, West Cumbria

Physical size: principal seams to be worked would be the Bannock Band and Main Band, which are at a depth of approximately 350 metres over 23ha

Time: applying for planning permission from 2022-2049

Published: 03/08/2022

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments

Never miss an update! Sign up to our Newsletter

OTHER STORIES

Write to your MP to stop the Whitehaven coal mine proposal

The decision to stop or allow the proposed 61.4 million tonne coal mine has been delayed. We are keen to apply as much pressure to stop the mine as possible. Please join us in writing to your MP now to ask that they do everything in their power to stop the mine.

Key facts: Whitehaven coal mine

Coal to be excavated: 61.4 million tonnes of coal in total and 2.93 million tonnes of coal per annum (at full capacity)

Coal to be sold: 55.6 million tonnes of coal in total and 2.78 million tonnes of coal per annum (at full capacity)…

Lochinvar proposal – a licence to harm

New Age Exploration Ltd propose to extract up to 33.7 million tonnes of coking coal for steelworks in the UK and beyond between 2025 and 2051 near Carlisle, in South West Scotland. This may worsen local air quality, reduce the value of nearby residential properties, make local roads more dangerous with HGV traffic, and will emit around 73 million…

Anti-coal workshop – Earth First! Summer gathering

We will be running a workshop at this year’s Earth First! Summer gathering, which runs Wednesday 31st till Monday 5th in the South West of England.

Energy capacity market consultation response

We are concerned that the 2024 coal phase-out date is being used by the UK Government to deflect criticism for its support of using coal up until that date, when what we need is the most rapid phase-out of coal that is possible as the UK careers further from its climate targets…

Whitehaven coal mine decision due – Russia’s invasion of Ukraine is no excuse to mine

Several years ago West Cumbria Mining Ltd, backed by an Australian company applied to extract coal from a new underground coking coal mine under the sea by Whitehaven, Cumbria. A decision is now due, but there are some using the appalling invasion of Ukraine by Russia to justify more mining in the UK.

Utilities struggle to insure new coal power, contracts reveal

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Nec dui nunc mattis enim ut tellus elementum. Massa massa ultricies mi quis.

Aberpergwm and the Well-being of Future Generations (Wales) Act

There is a law in Wales that helps the country all work together to improve the environment, the economy, the society and the culture. For people, for the planet. For now, and for our future. It is called the Well-being of Future Generations Act. Is it compatible with a coal mine extension at Aberpergwm?

Coal Action Network protest outside of Lloyd’s of London AGM

Last Thursday, 18th May, Coal Action Network protested outside of Lloyd’s of London, for their role in insuring the expansion of the Trans Mountain Pipeline (TMX) and the East Africa Crude Oil Pipeline (EACOP).

CONNECT WITH US

0
Would love your thoughts, please comment.x
()
x