Concrete opportunities for coal-free cement works

Recommended actions:

  1. The UK Government must encourage (through policy and strategic co-funding) and support (through negotiating significant Advance Market Commitments) the UK's 10 cement works to adopt publicly funded cement industry R&D into commercial scale implementation to ensure value-for-money, and rapidly cut coal use.
  2. The UK Government should require construction projects to report on embodied CO2 to stimulate sector demand for low-carbon cement products. As already called for by the sector.
  3. The UK Government should work with the cement and construction industries to research and certify more efficient cement formulations, and revise industry standards to safely reduce the quantities of cement required in construction.
  4. Industry must share pioneering coal-substitution techniques and technologies via frameworks of cooperation that could be brokered by existing international trade bodies such as the Global Cement and Concrete Association.

Concrete numbers

Global cement production

Worldwide, the amount of cement being used for every person in the world has nearly tripled in the past 45 years and demand is projected to increase over 33% by 2050. This demand is driving an exponential growth in cement production - and 'clinker', a key binding agent in cement. Clinker is the main ingredient in most cement mixes, averaging 75% of its content, but can be up to 95% of the content in Ordinary Portland Cement mix (a common type of cement). To make clinker, limestone and clay are heated to around 1450c, creating a chemical reaction. To generate this heat, the industry generally burns fossil fuels - although alternatives exist. Burning the fuel emits an average of 35% of the clinker CO2 footprint, with the remainder (65%) emitted by the chemical reaction of the heated limestone. In total, the cement industry has reduced its reliance on fossil fuels to heat clinker by 22% from 98% in 1990 to 76% in 2023, with post-use mixed waste and biomass increasing their share as alternative fuels. This concrete progress has helped reduce the carbon intensity of the fuel mix by 8% between 1990 and 2023. Unfortunately, this reduction has been outstripped by increases in cement production overall since 1990, so total fossil fuel consumption has actually increased by 100 million gigajoules (GJ), from 1.78bn GJ in 1990 to 1.88bn GJ in 2023.

(Except where specified, figures are sourced from the GCCA, Getting the Numbers Right Project, Emissions Report 2023 - for External Stakeholders industry-reported dataset)

Cementing coal use

Today, 76% of the heat needed to make clinker is generated by burning fossil fuels, with coal constituting 49% of the fossil fuel mix - meaning 37% of cement worldwide is made by burning coal. Consequently, the cement industry consumes around 4% of global coal produced, which amounts to approximately 330 million tonnes of coal per year. UK Government research and commercial examples from around the world indicate that the elimination of fossil fuels in cement production is possible. Thermal coal is the most common fuel burned to produce the high heat required.

Two ways to reduce the UK cement industry’s reliance on burning coal:

Burn alternative fuels instead of coal

Successful, at-scale, examples already exist of cement works burning 100% fuel alternatives to traditional fossil fuels, including pilot projects using combinations of hydrogen and biomass (UK) and hydrogen and electricity (Sweden). Yet, innovations such as use of hydrogen and kiln electrification are forecast to play only a small role, providing 10% of energy needs by 2050. Worldwide, only 24% of cement in 2023 was produced using alternative fuels, with 76% of cement produced using fossil fuels (37% of cement overall is heated using coal). The continuing reliance on burning fossil fuels to generate heat at cement works contributes to its high CO2 footprint – particularly its upstream footprint due to the resources and methane emissions associated with mining coal. Globally, the cement industry is responsible for up to 7-8% of CO2 emissions (but only 1.5% of UK CO2 emissions) – nearly as much as steel.

Coal-free fuel examples from around the world:

Substitute up to 100% of clinker with other cementious materials

Globally, the clinker ratio to cement (Portland and blended) has reduced from 85% in 1990 to 75% in 2023. The use of clinker substitutes has correspondingly increased by 12.7 million tonnes between 1990 and 2023, but much of this increase may be accounted for by the overall growth in cement production. Although most ‘green cement’ works around the world substitute up to 40% of clinker, there is at least one commercial example of a cement works substituting up to 100% of the clinker in their cement production. The use of alternative cementious materials reduce, or even eliminate the needs for clinker. Unlike clinker, these alternative cementious materials don’t require as much, or any, heating – thereby reducing the amount of coal burned. Some of these materials, such as the coal by-products of fly-ash and blast furnace slag, are in increasingly short supply as economies decarbonise. However, other clinker substitutes such as burnt rice husks do not face supply issues, and a lack of acceptance by the construction sector continues to be the most limiting factor in producing more cement with a lower clinker content. One solution to this would be Government mandating that publicly-funded construction projects must use entirely or partially ‘low carbon’ cement products where clinker substitutes have been included.

Clinker substitution examples from around the world:

UK cement trends

In contrast to worldwide trends, UK cement production has been in decline since a peak in the 1970s, and roughly halving since 1990. Despite this decline, the UK cement industry still burned just under 400,000* tonnes of coal to make 7.3 million tonnes of cement in 2024 – averaging roughly 1 tonne of coal for every 18 tonnes of cement. To put that into context, around 8,000 tonnes of cement is needed for a new hospital, while between 3-5 tonnes are needed to build a four-bedroom family house.

*There is no cement-specific coal consumption statistics available, but the UK Government reported that 395,000 tonnes of coal were used in the minerals industry in 2024, the vast majority of which would be cement. The burning of this coal alone would have emitted nearly a million tonnes of CO2 in 2024. The UK's cement works emitted 4.2 million tonnes of CO2 overall.

Depicts cement production process

Action needed for UK cement works to go coal-free

At the moment, there are isolated examples of cement works around the world that operate entirely without burning coal or fossil fuels. Yet all large UK cement works continue relying on coal and fossil fuels. The £3.2 million public fund to research pathways to decarbonise UK cement making is welcome, but to get value for money, proven pathways must be implemented at commercial cement works.

Carbon Capture & Storage - risks:

There is also a proposal to create a CCS network (Peak Valley Cluster), funded in part by the new UK National Wealth Fund. The CCS project would aim to reduce CO2 emissions from several cement works in Derbyshire and Staffordshire. But the high-risk CCS technology is an extremely expensive decarbonisation pathway, with high construction and running costs. The UK Government pledged an eye-watering £22 billion from 2025, driving even more households into fuel poverty (currently 11% of UK households struggle in energy poverty). Given the many £billions poured into the technology around the world, it has a disastrous global track-record of cancellations, suspensions soon after operating, and under-performance of up to 50%. Crucially, CCS will also do nothing to remove coal from the cement-making process, failing to reduce any upstream emissions or harms associated with coal mining and resource extraction in the supply chain. Investment in CCS is investment diverted from eliminating our use of fossil fuels, thereby prolonging our reliance on them.

Share now:

Subscribe
Notify of
guest

0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Never miss an update! Sign up to our Newsletter

OTHER STORIES

World leading standards for operational and legacy industrial emissions

During their party conference, Plaid Cymru announced plans for their first hundred days of Government, should they win the Welsh election. Having now formed the Government, we hope to work with them and other Members of the Senedd to achieve some of those priorities. This is the last of three posts outlining opportunities which could help them to do that…

Environmental justice for coalfield communities

During their party conference, Plaid Cymru announced plans for their first hundred days of Government, should they win the Welsh election. Having now formed the Government, we hope to work with them and other Members of the Senedd to achieve some of those priorities. This is the second of three posts outlining opportunities which could help them to do that…

Unleash mine water heat potential to warm Welsh communities

During their party conference, Plaid Cymru announced plans for their first hundred days of Government, should they win the Welsh election. Having now formed the Government, we hope to work with them and other Members of the Senedd to achieve some of those priorities. This is the first of three posts outlining opportunities which could help them to do that…

Opencast vs deep coal mines

Deep coal mines have a long history in the UK dating back some 400 years. On the other hand, opencast coal mines only became common between 1940 and 60, becoming the dominant mining method in the UK as deep coal mining entered rapid decline. Opencast coal mining techniques…

Welsh parties commit to restoration ahead of elections

We worked with media outlet, Nation.Cymru, to ask where the main political parties in Wales stands on restoration issues ahead of the Welsh election on 07th May 2026. This is a key issue for many people, but particularly those who live near under-restored opencast coal mine sites…

Ben Hodge-McKenna on reopening Welsh coal mines

As part of our Politics Unspun series we are unpacking politicians’ public comments on coal to challenge any misleading or incorrect messages. Todays’ focus is on comments made in a BBC interview during the Senedd election campaign about coal mining in Wales. During the interview, Reform UK candidate in Afan Ogwr Rhondda, Ben Hodge-McKenna…

Our 2026 Wales manifesto

Coal Action Network is proud to present our 2026 manifesto for Wales. With the Senedd elections taking place in May this year, Wales stands at a decisive moment. For over a century, coal has shaped Welsh landscapes, communities, and politics. Today, Wales has the opportunity to shape something very different…

Lee Anderson on dirty, horrible, dangerous coal jobs

As part of our Politics Unspun series we are unpacking politicians’ public comments on coal to challenge any misleading or incorrect messages. Todays’ focus is on comments made during a Westminster Hall debate in December 2025 about the oil refining sector. During the debate, Lee Anderson MP made some statements about coal…

Take Action – End new English coal

The Government is reforming planning policy in England and thanks to thousands of our supporters asking for an end to coal extraction in the last consultation in 2024, they are now recommending that planners “should not identify new sites or extensions to existing sites for peat or coal extraction”…

CONNECT WITH US

Share now: