Skip to content
Coal Action Network
  • About usExpand
    • Contact us
    • Solutions
    • Donate
  • CampaignsExpand
    • Coal mines
    • Restoration
    • Industry
    • Mine water heat
    • Policy
    • Boycott bloody insurance
  • News
  • ResourcesExpand
    • Publications
    • Coal facts & figures
    • Politics unspun
    • Myth busters
  • The NetworkExpand
    • Beyond Fossil Fuels
    • London Mining Network
    • UVAG (United Valleys Action Group) South Wales
    • Supporters of Sirhowy Valley Country Park
    • Stop the West Cumbria coal mine
    • Stop Adani
    • Save Druridge, Northumberland
    • Defend Dewley Hill, Newcastle
    • Campaign to Protect Pont Valley, Durham
  • Donate
Coal Action Network
Hours Posted on24/04/202401/09/2026 Hours Updated on01/09/2026

Key facts: Aberpergwm coal mine expansion

Coal & refuse to be excavated: 72 million tonnes in total – 30 million tonnes of which will be “middling” coal to be dumped or put back into the coal mine.

Coal to be sold: 42 million tonnes during the life of the extension

CO2: 100-120 million tonnes of CO2, according to uses listed below (2022 BEIS Conversion Factors)

Methane: up to 1.17 million tonnes of methane, a powerful climate accelerant

Coal operator (mining company): Energybuild Ltd/Energybuild Mining Ltd.

Type: Anthracite with some lower-grade coal

Claimed uses:

  • 2022: According to Energybuild Ltd, 60% of the coal goes to steelworks, 20% domestic heating (80% overall), with the remaining to mixed industrial uses
  • 2023: Energybuild Ltd predicts, overall, 70% of the coal will go to steelworks and domestic heating (reduction of 10%), with the remaining to mixed industrial uses

The planning application said power stations and steel works. With Aberthaw power station closed, Energybuild now talks of Pulverised injection for steelmaking, household heating, cement, and water filtration.

County Council Local Planning Authority: Neath Port Talbot

Address: Glynneath, Neath, SA11 5AJ

Physical size: Because this is an underground mine, much of the excavation would be invisible but very real, as communities victim to flooding mine shafts have experienced. The underground tunnelling has permission to extend to 2.3km squared, taking you roughly half an hour to walk from one side of the tunnels to the other. And this doesn’t factor in the vertical shafts, sending offshoots that go beneath the River Dulais.

Time: Planning permission to mine coal until 2039 (this is often subsequently extended).

Aberpergwm coal mine
Coal mine campaigns

Post navigation

Previous Previous
Support local campaign group resist Bedwas coal mine
NextContinue
Hearing date set for proposed West Cumbria Coal mine

Coal facts

Campaigns

Publications

  • About us
  • Campaigns
  • News
  • Resources
  • The Network
  • Donate
Facebook Instagram YouTube Bluesky

© 2026 Coal Action Network

  • Contact us
  • Support our work
  • About us
    • Contact us
    • Solutions
    • Donate
  • Campaigns
    • Coal mines
    • Restoration
    • Industry
    • Mine water heat
    • Policy
    • Boycott bloody insurance
  • News
  • Resources
    • Publications
    • Coal facts & figures
    • Politics unspun
    • Myth busters
  • The Network
    • Beyond Fossil Fuels
    • London Mining Network
    • UVAG (United Valleys Action Group) South Wales
    • Supporters of Sirhowy Valley Country Park
    • Stop the West Cumbria coal mine
    • Stop Adani
    • Save Druridge, Northumberland
    • Defend Dewley Hill, Newcastle
    • Campaign to Protect Pont Valley, Durham
  • Donate