Skip to content
Coal Action Network
  • About usExpand
    • Contact us
    • Solutions
    • Donate
  • CampaignsExpand
    • Coal mines
    • Restoration
    • Industry
    • Mine water heat
    • Policy
    • Boycott bloody insurance
  • News
  • ResourcesExpand
    • Publications
    • Coal facts & figures
    • Politics unspun
    • Myth busters
  • The NetworkExpand
    • Beyond Fossil Fuels
    • London Mining Network
    • UVAG (United Valleys Action Group) South Wales
    • Supporters of Sirhowy Valley Country Park
    • Stop the West Cumbria coal mine
    • Stop Adani
    • Save Druridge, Northumberland
    • Defend Dewley Hill, Newcastle
    • Campaign to Protect Pont Valley, Durham
  • Donate
Coal Action Network
Hours Posted on18/10/202401/09/2026 Hours Updated on01/09/2026

Key facts: Glan Lash opencast coal mine expansion

Bryn Bach Coal Ltd is the coal mining company that operates the Glan Lash opencast coal mine, which has been dormant since planning permission expired in 2019. In 2018, it applied for an extension which was unanimously rejected by planning councillors in 2023. Undeterred, Bryn Bach Coal Ltd is trying again! This time with a slightly smaller extension of some 85,000 tonnes rather than 95,000 tonnes. Check out the company’s application and public responses so far.

2024 Proposal (reduced the refused 2019 proposal)

Coal to be sold: 85,000 tonnes in total – average of 328 tonnes per week

CO2: Approximately 271,000 tonnes of CO2 in total (2024 BEIS Conversion Factors)

Methane: ~659 tonnes in total –  circa108 tonnes each year.

Coal operator: Bryn Bach Coal Ltd – since grant of planning permission January 2012 – 2019

Type: Anthracite coal

Mining method: Opencast

Purported destination: Brake pads, water filtration, brick colourant etc.

Local Planning Authority: Carmarthenshire County Council

Address: Glan Lash Mine Site, Shands Road, Llandybie, Blaenau, Carmarthenshire SA18 3NA

Physical size: 10.03 hectares, with a void of 5.92 hectares (extended void = roughly 11 football pitches)

Time: 5.4 years of coal extraction, 7 years of all works on the site

Glan Lash coal mine
Coal mine campaigns

Post navigation

Previous Previous
Another nail in the coffin for West Cumbria Mining Ltd
NextContinue
We have to do better by steelworkers…

Coal facts

Campaigns

Publications

  • About us
  • Campaigns
  • News
  • Resources
  • The Network
  • Donate
Facebook Instagram YouTube Bluesky

© 2026 Coal Action Network

  • Contact us
  • Support our work
  • About us
    • Contact us
    • Solutions
    • Donate
  • Campaigns
    • Coal mines
    • Restoration
    • Industry
    • Mine water heat
    • Policy
    • Boycott bloody insurance
  • News
  • Resources
    • Publications
    • Coal facts & figures
    • Politics unspun
    • Myth busters
  • The Network
    • Beyond Fossil Fuels
    • London Mining Network
    • UVAG (United Valleys Action Group) South Wales
    • Supporters of Sirhowy Valley Country Park
    • Stop the West Cumbria coal mine
    • Stop Adani
    • Save Druridge, Northumberland
    • Defend Dewley Hill, Newcastle
    • Campaign to Protect Pont Valley, Durham
  • Donate