Banks Group want to expand the Bradley Opencast coal mine in the Pont Valley. Campaign to Protect Pont Valley have launched a new campaign to oppose this planning application and they need your support.
Inspired by Defend Dewley Hill, which this summer garnered over 4,000 objections to Banks Group’s proposal to opencast near Newcastle, we want to raise ‘a mountain’ of objections to the scheme.
I am opposed to this extension of the Bradley opencast in the Pont Valley because.......
Can you email Durham County Council to tell them in your own words why you are opposed to this opencast extension?
Some of the reasons people object to it:
- Noise, dust and blasting near to homes
- This coal is not needed.
-Destruction of further habitats
-We need to stop burning fossil fuels now
Read on below to find out more about these.
Choose one or two. Find a way to say it in your own words. It doesn’t need to be long, or super knowledgeable. It needs to show you care. It can also be long if you have an eye for detail and some time.
Email your objection to planning@durham.gov.uk and copy in protectpontvalley@gmail.com
Make sure to include these two reference numbers DM/19/03567/MIN and DM/19/03569/VOCMW and your postcode.
I am opposed to this extension of the Bradley opencast in the Pont Valley because.......
Local Impacts
• Homes close to the site will be affected – there are homes 150 metres from the site, even closer than High Stables where people already experience daily noise, regular blasting and dust falling in their gardens, which they are breathing in. It will be only 80 meters from the local pub, the Jolly Drovers.
• There is a cumulative impact with the original mine and surrounding deforestation, an extension would add to this – local authorities are meant to protect people from the cumulative impact of ‘development’. Local residents complaints about the existing opencast ignored. Banks claim they offer ‘development with care’ but we feel we have been treated with nothing but contempt.
• Five more months of coal dust and blasting. Banks say that the expansion can be done within the original time frame and restoration completed in 12 months by August 2021. They are keeping quiet about coal extraction needing to go on for a further 5 months, to Jan 2021 instead of finishing in August 2020.
• There are protected species on the land they want to dig up – birds, butterflies, badgers and rare fungus. This habitat has already been severely damaged by the existing mine and an expansion will put increased stress on the diverse species that remain in the area. It permanently affects the migration and nesting sites of birds; swallows, cuckoos, skylarks and curlew which may never return.
• The new application doesn’t support any additional jobs. Banks say it supports jobs, but workers could move to their wind projects.
Global/National Reasons to object
• We don’t need more coal. Banks claim they are saving carbon emissions in transport because the coal is ‘local’, but they are adding to the UK’s huge surplus of coal, which is being increasingly exported abroad and contributes to climate change wherever it is burned.
• The tide has turned against coal. There have been no new opencast approved through the planning system since January 2016.
• Durham County Council has declared a Climate Emergency. The UK is meant to be carbon neutral by 2050.
• Banks coal is going to power stations where there is already a substantial surplus. They claim their coal is essential for steel manufacturing but have provided no evidence that that is where it’s going. Furthermore, the steel industry already has established suppliers of coal and is not expanding.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Nec dui nunc mattis enim ut tellus elementum. Massa massa ultricies mi quis.
Mining company, ERI Ltd, is applying to mine nearly half a million tonnes of coal from two coal tips dumped in Caerphilly, South Wales, by the mining industry last time it operated in the area. It’s vital we stop this shameless attempt to exploit the mess left behind by the mining industry to justify yet more mining. If the coal tip mining were to go ahead, it would…
Coal Action Network’s drone footage on Monday 11th March raised the alarm bell about the rising water levels. With this footage, a local resident informed Merthyr Tydfil County Borough Council of the rising water levels, only to be told…
The insurance industry found itself in the spotlight last week as a Global Week of Action blossomed across the world. From February 27th to March 3rd 2024, a wave of protests, both online and in the streets, swept through the doors of insurance giants, demanding accountability over their support for polluters and decisive action on climate change.
After a week of peaceful protest around the world, alongside hundreds of groups, our efforts have paid off. Yet another leading insurance company, Probitas, has ruled out insuring the proposed West Cumbria coal mine and the East African Crude Oil Pipeline (EACOP).
‘Energy Recovery Investments Ltd’ is proprosing to extract the coal from 3 large coal tips in Bedwas, Caerphilly, South Wales. The company claims that it would use some of the sales of the coal to restore those coal tips later. The coal tips lie above a coal seam, which the company claims it would coincidentally have to dig into to create ‘lagoons’ for processing the coal from the coal tips…
The Crown Prosecution Service has dropped all charges against the four Extinction Rebellion (XR) activists who blockaded the entrance to the UK’s largest open-cast coal mine, last summer with a pink boat. While removing the immediate burden of legal confrontation for the defendants, the decision has left a “crater of unfinished business” in the fight for climate justice and accountability for local residents…
Citing different grounds to the High Court, the Court of Appeal has nevertheless found against our appeal. The Court of Appeal judges disagreed with the judge in the High Court, and decided that current statute limits Welsh Ministers to only deciding whether a new conditional licence may be issued…
Today, 6th February 2024, Coal Action Network was back in court, this time appealing last year’s decision by the court that the Welsh Government couldn’t prevent an extension at Aberpergwm coal mine.